Whole Food Market is the
anchor tenant at this familiar Veterans Boulevard site
that was previously occupied by an automobile dealership.
This project consisted of first, the demolition of
the existing building and site paving, afterward performing
substantial site work, pile-driving, and the construction
of a 52,200 square foot concrete block, brick and plaster
building. The interior work required the installation
of an overabundance of underground utilities under
and within a new concrete slab, drywall partitions & fur-downs
to be constructed and painted, staining of concrete
floors, ceramic tile and epoxy flooring, over 170 tons
of HVAC, electrical, and refrigeration cases. Work
began in December 2004 and will be completed in May
2005.